GINEMA.
HomeMoviesTV ShowsNetworksUniverses
HomeMoviesTVNetworksUniverses
On the Critical Path
On the Critical Path
Feature Film

On the Critical Path

71971 0h 22mNRDocumentary

Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

Watch Now

Comments

0 reviews
Sign in to leave a review
Pick a reaction and share what you thought of On the Critical Path.
No reviews for this filter yet.

More Like This

Inside Chernobyl with Ben Fogle
7.6
Movie
2021
Inside Chernobyl with Ben Fogle
Uranium Drive-In
0
Movie
2013
Uranium Drive-In
Th (Part 11:  Dr. Helen Caldicott)
5.1
Movie
2014
Th (Part 11: Dr. Helen Caldicott)
Seabrook 1977
0
Movie
1978
Seabrook 1977
Nuclear Now
7.1
Movie
2023
Nuclear Now
Decommissioning Fukushima 2024: Roadmap on the Brink
0
Movie
2024
Decommissioning Fukushima 2024: Roadmap on the Brink
Elektro-Lähmung - Ein Film gegen die politische Ohnmacht
0
Movie
1989
Elektro-Lähmung - Ein Film gegen die politische Ohnmacht
The Atom: A Love Affair
6.5
Movie
2019
The Atom: A Love Affair
The Red Princess
7
Movie
2022
The Red Princess
Radioactive: The Women of Three Mile Island
6.3
Movie
2024
Radioactive: The Women of Three Mile Island
We Are the Guinea Pigs
6
Movie
1980
We Are the Guinea Pigs
Power from the Atom
0
Movie
1975
Power from the Atom
The Power of Matter
7
Movie
1960
The Power of Matter
Reconstruction of the NRX Reactor 1970
8
Movie
1973
Reconstruction of the NRX Reactor 1970
Nuclear Fuel Waste Management
0
Movie
1979
Nuclear Fuel Waste Management
Nuclear Fuel Waste Research: The Canadian Program
0
Movie
1979
Nuclear Fuel Waste Research: The Canadian Program
GINEMA.
© 2026

Ginema does not host any content. All media is sourced from 3rd-party services.